The Challenge
The exterior of the NIA Dublin posed some interesting design challenges, requiring excellent collaboration and co-ordination between design and construction teams to find the smartest, most efficient methods for façade construction.
Perhaps the greatest challenge posed was the lack of physical space in which to complete the build. Typically, panels that are fitted mechanically can be built in unitised sections offsite before being attached to the building.
However, space constraints and restricted access meant that this was not a viable option. The use of Trespa® Meteon® A03.0.0 8mm thick decorative laminate panels for the façade also presented the teams with a load bearing consideration to address, whilst complying with the architect’s requirements for a “secret fix”.
Â
The Solution
From an early stage in the design, technical teams from Sherwin-Williams and Dow collaborated with representatives from Mosco Gleeson to find a solution for the attachment of the lower façade. Mosco Gleeson is a design and installation company specialising in steel and polymer structures, project managing, designing and installing large scale and intricate facades.
Sherwin-Williams is the strategic partner of Dow for the distribution of sealants and adhesives in the UK and Ireland.
Mosco Gleeson engaged with Dow early in the design process and found them to be an invaluable technical partner in assisting with the development of their designs and their proposed fixing methodology. They already had previous experience working with Dow on silicone structural glazing designs which provided additional reassurance concerning the proposed selection of the DOWSIL™ PanelFix System.
DOWSIL™ PanelFix Adhesive has high strength and elasticity and is specifically designed for non-glass panel applications requiring high durability and fast handling. This, in conjunction with DOWSIL™ PanelFix Tape and their recommended cleaning and priming materials, enabled direct on-site application of cladding panels to the frame sub-structure. Without the need for mechanical fasteners, the bonding is not visible, a prerequisite of this particular installation.
The Dow technical laboratory assisted with pull tests to confirm the adhesive bond strength on representative frame samples, producing a comprehensive report and technical data set. As result, Mosco Gleeson were confident in proceeding with the install using the DOWSIL™ PanelFix system versus traditional mechanical fix alternatives. Mosco Gleeson utilised 3D modelling to analyse and progress the “panel” set out in order to maximise efficiencies before attending on-site. DOWSIL™ 896 PanelFix Adhesive and DOWSIL™ PanelFix Tape was then used to fix the Trespa® Meteon® façade panels directly onsite to a Mosco Gleeson rail system; this in turn had been attached to underlying Kingspan® and Eurobond Rainspan interlocking insulation boards. This complete system of fixation has no visible connection points, delivering a beautiful aesthetic to the façade whilst complying with the architect’s exacting requirements.
Sherwin-Williams also attended the site to provide special training to Mosco Glesson installers and the project team, which demonstrated the substrate preparation and cleaning procedures for the specified DOWSIL™ R41 Cleaner prior to the application of the DOWSIL™ Panel Fix Tape and DOWSIL™ PanelFix Adhesive. The Sherwin-Williams Technical Team then installed the Trespa® Panel onto to a mock-up structure to illustrate the bonding steps and ease and speed of installation.
Â
The Dow PanelFix System
Tailor-made for façade cladding applications, the DOWSIL™ PanelFix System is a cost-effective, easy to use solution for non-glass panel bonding. With no visible connection points for improved aesthetics, it expands building cladding design possibilities whilst maintaining safety and control. With fast adhesion build up and immediate high tack upon application, the DOWSIL™ PanelFix system has been assessed by the BBA, Agrément Certificate No 16/5306.